A linear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
Scheduling of activities in manufacturing and service enterprises should perform efficiently, since it impacts both productivity and competitiveness. This study analyzes a real case of green wood dryers in a sawmill in Chile, with a set of ten parallel machines with three different technologies, wit...
Κύριοι συγγραφείς: | Cifuentes, Nayaret, Gatica, Gustavo, Linfati, Rodrigo |
---|---|
Μορφή: | Online |
Γλώσσα: | eng |
Έκδοση: |
Universidad Pedagógica y Tecnológica de Colombia
2017
|
Θέματα: | |
Διαθέσιμο Online: | https://revistas.uptc.edu.co/index.php/ingenieria/article/view/7309 |
Παρόμοια τεκμήρια
- Παρόμοια τεκμήρια
-
The Mirror in La Rambla paralela [My Parallel Deaths] (2002) by Fernando Vallejo
ανά: Domínguez Torres, Mario Alberto
Έκδοση: (2017) -
The Volatility of the Parallel Exchange Rate in Venezuela 2005-2015
ανά: Castillo Paredes, Laura Daniela, κ.ά.
Έκδοση: (2017) -
Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
ανά: Ortiz-Pimiento, Néstor Raúl, κ.ά.
Έκδοση: (2019) -
A memetic algorithm for minimizing the makespan in the Job Shop Scheduling problem
ανά: Lamos-Díaz, Henry, κ.ά.
Έκδοση: (2017) -
Science Fiction and Religion: A parallel between The Time Machine and Perelandra
ανά: Araújo, Naiara Sales, κ.ά.
Έκδοση: (2020)