A linear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
Scheduling of activities in manufacturing and service enterprises should perform efficiently, since it impacts both productivity and competitiveness. This study analyzes a real case of green wood dryers in a sawmill in Chile, with a set of ten parallel machines with three different technologies, wit...
Main Authors: | Cifuentes, Nayaret, Gatica, Gustavo, Linfati, Rodrigo |
---|---|
פורמט: | Online |
שפה: | eng |
יצא לאור: |
Universidad Pedagógica y Tecnológica de Colombia
2017
|
נושאים: | |
גישה מקוונת: | https://revistas.uptc.edu.co/index.php/ingenieria/article/view/7309 |
- פריטים דומים
-
The Mirror in La Rambla paralela [My Parallel Deaths] (2002) by Fernando Vallejo
מאת: Domínguez Torres, Mario Alberto
יצא לאור: (2017) -
The Volatility of the Parallel Exchange Rate in Venezuela 2005-2015
מאת: Castillo Paredes, Laura Daniela, et al.
יצא לאור: (2017) -
Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
מאת: Ortiz-Pimiento, Néstor Raúl, et al.
יצא לאור: (2019) -
A memetic algorithm for minimizing the makespan in the Job Shop Scheduling problem
מאת: Lamos-Díaz, Henry, et al.
יצא לאור: (2017) -
Science Fiction and Religion: A parallel between The Time Machine and Perelandra
מאת: Araújo, Naiara Sales, et al.
יצא לאור: (2020)