Control system upgrading for the hopper filling process units I, II and III in the Paipa Thermoelectric Company

This document shows the current operation of the filling process of coal hoppers of the units I, II and IIIPaipa Thermoelectric Company, Boyacá, Colombia. On this basis, a diagnosis of proposals for creating automate proposals of the process based on design criteria like the achievements and the lim...

全面介紹

書目詳細資料
Main Authors: Suárez-Corredor, Andrés Felipe, Jiménez-López, Fabián Rolando
格式: Online
語言:spa
出版: Universidad Pedagógica y Tecnológica de Colombia - UPTC 2010
主題:
在線閱讀:https://revistas.uptc.edu.co/index.php/ingenieria_sogamoso/article/view/916
實物特徵
總結:This document shows the current operation of the filling process of coal hoppers of the units I, II and IIIPaipa Thermoelectric Company, Boyacá, Colombia. On this basis, a diagnosis of proposals for creating automate proposals of the process based on design criteria like the achievements and the limitations of the project and the requirements are established for the selection of controllers, sensing devices and actuators for manipulating the implicit variables in the process. Similarly possible changes in civil engineering machinery are established and specific systems with their impact on the performance process and ultimately the programming logic is designed for the programmable logic controller that was selected to run the process in manually, automatic and semiautomatic.