Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
In the Project Scheduling Problem (PSP), the solution robustness can be understood as the capacity that a baseline has to support the disruptions generated by unplanned events (risks). A robust baseline of the project can be obtained from redundancy based methods, which are considered proactive meth...
Үндсэн зохиолчид: | Ortiz-Pimiento, Néstor Raúl, Díaz-Serna, Francisco Javier |
---|---|
Формат: | Online |
Хэл сонгох: | eng |
Хэвлэсэн: |
Universidad Pedagógica y Tecnológica de Colombia
2019
|
Нөхцлүүд: | |
Онлайн хандалт: | https://revistas.uptc.edu.co/index.php/ingenieria/article/view/9756 |
Ижил төстэй зүйлс
- Ижил төстэй зүйлс
-
Robust Controller LMI for helicopter with two degrees of freedom
-н: Higuera-Martínez, Oscar Iván, зэрэг
Хэвлэсэн: (2015) -
A linear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
-н: Cifuentes, Nayaret, зэрэг
Хэвлэсэн: (2017) -
A memetic algorithm for minimizing the makespan in the Job Shop Scheduling problem
-н: Lamos-Díaz, Henry, зэрэг
Хэвлэсэн: (2017) -
Spectrophotometric Determination Profile Of Bisphenol A In The Photodegradation Process With Singlet Molecular Oxygen
-н: Doria Herrera, Gloria Maria, зэрэг
Хэвлэсэн: (2020) -
Enhancing use of the cubic space of hose export containers in an agro-industrial company in Perú
-н: Aradiel Abad, Cristhian Giancarlo, зэрэг
Хэвлэсэн: (2021)