Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
In the Project Scheduling Problem (PSP), the solution robustness can be understood as the capacity that a baseline has to support the disruptions generated by unplanned events (risks). A robust baseline of the project can be obtained from redundancy based methods, which are considered proactive meth...
Автори: | Ortiz-Pimiento, Néstor Raúl, Díaz-Serna, Francisco Javier |
---|---|
Формат: | Online |
Мова: | eng |
Опубліковано: |
Universidad Pedagógica y Tecnológica de Colombia
2019
|
Предмети: | |
Онлайн доступ: | https://revistas.uptc.edu.co/index.php/ingenieria/article/view/9756 |
Схожі ресурси
- Схожі ресурси
-
Robust Controller LMI for helicopter with two degrees of freedom
за авторством: Higuera-Martínez, Oscar Iván, та інші
Опубліковано: (2015) -
A linear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
за авторством: Cifuentes, Nayaret, та інші
Опубліковано: (2017) -
A memetic algorithm for minimizing the makespan in the Job Shop Scheduling problem
за авторством: Lamos-Díaz, Henry, та інші
Опубліковано: (2017) -
Spectrophotometric Determination Profile Of Bisphenol A In The Photodegradation Process With Singlet Molecular Oxygen
за авторством: Doria Herrera, Gloria Maria, та інші
Опубліковано: (2020) -
Enhancing use of the cubic space of hose export containers in an agro-industrial company in Perú
за авторством: Aradiel Abad, Cristhian Giancarlo, та інші
Опубліковано: (2021)