Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana
Spa: Trabajo que contiene resultados sobre la importancia del Commissioning en proyectos mediante el uso en un estudio de caso de facilidades de inyección de agua en la industria petrolera colombiana.
Main Author: | |
---|---|
Other Authors: | |
Format: | Trabajo de grado - Maestría |
Language: | spa |
Published: |
Universidad Pedagógica y Tecnológica de Colombia
2022
|
Subjects: | |
Online Access: | http://repositorio.uptc.edu.co/handle/001/8529 |
_version_ | 1801705869927251968 |
---|---|
author | Gualteros Vanegas, Mayra Liliana |
author2 | Vera López, Enrique |
author_facet | Vera López, Enrique Gualteros Vanegas, Mayra Liliana |
author_sort | Gualteros Vanegas, Mayra Liliana |
collection | DSpace |
description | Spa: Trabajo que contiene resultados sobre la importancia del Commissioning en proyectos mediante el uso en un estudio de caso de facilidades de inyección de agua en la industria petrolera colombiana. |
format | Trabajo de grado - Maestría |
id | repositorio.uptc.edu.co-001-8529 |
institution | Repositorio Institucional UPTC |
language | spa |
publishDate | 2022 |
publisher | Universidad Pedagógica y Tecnológica de Colombia |
record_format | dspace |
spelling | repositorio.uptc.edu.co-001-85292023-07-17T21:37:21Z Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana Gualteros Vanegas, Mayra Liliana Vera López, Enrique González Sanabria, Juan Sebastián Commissioning Diseño sostenible Reguladores secuenciales programables Maestría en Gestión de Integridad y Corrosión - Tesis y disertaciones académicas Spa: Trabajo que contiene resultados sobre la importancia del Commissioning en proyectos mediante el uso en un estudio de caso de facilidades de inyección de agua en la industria petrolera colombiana. Bibliografía y webgrafía: página 73. Maestría Magister en Gestión de Integridad y Corrosión 2022-04-25T19:53:56Z 2022-04-25T19:53:56Z 2019 Trabajo de grado - Maestría http://purl.org/coar/resource_type/c_bdcc info:eu-repo/semantics/masterThesis info:eu-repo/semantics/publishedVersion Text https://purl.org/redcol/resource_type/TM http://purl.org/coar/version/c_970fb48d4fbd8a85 Gualteros Vanegas, M. L. (2019). Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana. [Tesis de maestría. Universidad Pedagógica y Tecnológica de Colombia, Facultad de Ingeniería]. http://repositorio.uptc.edu.co/handle/001/8529 http://repositorio.uptc.edu.co/handle/001/8529 spa B. Heinemann, and K. Martin, Chemical and process plant commissioning handbook: a practical guide to plant system and equipment installation and commissioning, Kidlington, Oxford, 2012. McGraw-Hill Publication, Chemical engineering: Plant startup-step by step by step, 1983. McGraw-Hill Publication, Chemical engineering: How to facility Startup a commonsense approach breaks this monumental task into manageable components, 1993. Norsok Standard, Common requirements, mechanical completion and commissioning, 1996. Whole Building Design Guide Federal Green Construction, Guide for Specifiers, section 01810, commissioning, pp.1-12, April. 2010. Availabe: http://fedgreenspecs.wbdg.org. D. Nicolae, and D. Alexandra, Virtual commissioning of a robotic cell using tecnomatix process simulate, Annals of the academy of romanian scientists, series on engineering sciences, vol. 9 (1), pp.45-599, 2017. Z. Chaoju, Z. Tie, X. Cao, and D. Chen, Key technologies for well completion and commissioning of ultra-deep sour gas reservoirs in the Yuanba Gasfield, Sinopec Southwest Petroleum Engineering: Chengdu, Sichuan, China. R. Roman, R. Holubek, and R. Daynier, “Faculty of materials science and technology,” Slovak university of technology in Trnava, vol. 26 (42), pp. 93- 101, 2018. Y. Peter, Going to school for building enclosure Commissioning, what I learned from the university of Wisconsin's, Commissioning building enclosure assemblies and systems course, 2017. Availabe: https://www.buildinggreen.com/blog/going-school-building-enclosurecommissioning. C. Coyner, P. E. Scott, and W. Kramer, “Long term benefits of building commissioning: should owners pay the price,” Procedia engineering, vol. 196, pp. 429-435, 2017. https://doi.org/10.1016/j.proeng.2017.07.220. U.S. department of veterans affairs (VA). Whole building commissioning process Manual. Washington DC, 2013. Nemotecnia Certificación Pre & Comisionamiento, Rev. Enero 2015, pp.1. Proyecto disposal 3 Y 4 1000 KBWPD, Ingeniería de detalle del proyecto. Marzo 2016, pp.1-103. Guía Comisionamiento BP, Rev. Enero 2015, pp.1-65. Copyright (c) 2019 Universidad Pedagógica y Tecnológica de Colombia Atribución-NoComercial-SinDerivadas 2.5 Colombia http://creativecommons.org/licenses/by-nc-nd/2.5/co/ info:eu-repo/semantics/openAccess Licencia Creative Commons Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) http://purl.org/coar/access_right/c_abf2 1 recurso en línea (73 páginas) : ilustraciones. application/pdf application/pdf application/octet-stream application/pdf Universidad Pedagógica y Tecnológica de Colombia Facultad Ingeniería Tunja Maestría en Gestión de Integridad y Corrosión |
spellingShingle | Commissioning Diseño sostenible Reguladores secuenciales programables Maestría en Gestión de Integridad y Corrosión - Tesis y disertaciones académicas Gualteros Vanegas, Mayra Liliana Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title | Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title_full | Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title_fullStr | Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title_full_unstemmed | Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title_short | Estudio de caso para realizar el Commissioning en un proyecto de facilidades de inyección de agua, en la industria petrolera colombiana |
title_sort | estudio de caso para realizar el commissioning en un proyecto de facilidades de inyeccion de agua en la industria petrolera colombiana |
topic | Commissioning Diseño sostenible Reguladores secuenciales programables Maestría en Gestión de Integridad y Corrosión - Tesis y disertaciones académicas |
url | http://repositorio.uptc.edu.co/handle/001/8529 |
work_keys_str_mv | AT gualterosvanegasmayraliliana estudiodecasopararealizarelcommissioningenunproyectodefacilidadesdeinyecciondeaguaenlaindustriapetroleracolombiana |