Control system upgrading for the hopper filling process units I, II and III in the Paipa Thermoelectric Company

This document shows the current operation of the filling process of coal hoppers of the units I, II and IIIPaipa Thermoelectric Company, Boyacá, Colombia. On this basis, a diagnosis of proposals for creating automate proposals of the process based on design criteria like the achievements and the lim...

Mô tả đầy đủ

Chi tiết về thư mục
Những tác giả chính: Suárez-Corredor, Andrés Felipe, Jiménez-López, Fabián Rolando
Định dạng: Online
Ngôn ngữ:spa
Được phát hành: Universidad Pedagógica y Tecnológica de Colombia - UPTC 2010
Những chủ đề:
Truy cập trực tuyến:https://revistas.uptc.edu.co/index.php/ingenieria_sogamoso/article/view/916
Miêu tả
Tóm tắt:This document shows the current operation of the filling process of coal hoppers of the units I, II and IIIPaipa Thermoelectric Company, Boyacá, Colombia. On this basis, a diagnosis of proposals for creating automate proposals of the process based on design criteria like the achievements and the limitations of the project and the requirements are established for the selection of controllers, sensing devices and actuators for manipulating the implicit variables in the process. Similarly possible changes in civil engineering machinery are established and specific systems with their impact on the performance process and ultimately the programming logic is designed for the programmable logic controller that was selected to run the process in manually, automatic and semiautomatic.