Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
In the Project Scheduling Problem (PSP), the solution robustness can be understood as the capacity that a baseline has to support the disruptions generated by unplanned events (risks). A robust baseline of the project can be obtained from redundancy based methods, which are considered proactive meth...
Main Authors: | Ortiz-Pimiento, Néstor Raúl, Díaz-Serna, Francisco Javier |
---|---|
格式: | Online |
语言: | eng |
出版: |
Universidad Pedagógica y Tecnológica de Colombia
2019
|
主题: | |
在线阅读: | https://revistas.uptc.edu.co/index.php/ingenieria/article/view/9756 |
- 相似书籍
-
Robust Controller LMI for helicopter with two degrees of freedom
由: Higuera-Martínez, Oscar Iván, et al.
出版: (2015) -
A linear programming model for the parallel non-related machines problem, in the drying area of a chilean sawmill
由: Cifuentes, Nayaret, et al.
出版: (2017) -
A memetic algorithm for minimizing the makespan in the Job Shop Scheduling problem
由: Lamos-Díaz, Henry, et al.
出版: (2017) -
Spectrophotometric Determination Profile Of Bisphenol A In The Photodegradation Process With Singlet Molecular Oxygen
由: Doria Herrera, Gloria Maria, et al.
出版: (2020) -
Enhancing use of the cubic space of hose export containers in an agro-industrial company in Perú
由: Aradiel Abad, Cristhian Giancarlo, et al.
出版: (2021)